    Project: Clarence Cannon NWR South Unit Water Control Structures, Berm Degrades, Gravity Drain Structures
    Client: US Army Corps of Engineers-St. Louis District
    Contract No. W912P9-16-D-0027
    Completion Date: 12/31/2020

    The US Army Corps of Engineers awarded this contract to DW Mertzke General Contractors on September 15, 2016. This project was a competitive 8(a) solicitation and D. W. Mertzke submitted the winning bid within 2% of the government estimate. The project consists of excavation, compacted embankment, degrade of existing levees, dewatering, seven cast in place concrete gravity drains, sheet piling, miscellaneous metals, sluice gates, overshot gate, stone protection, access roads, aggregate surfacing and establishment of turf. D.W. Mertzke will be self-performing 47% of the total contract.