Home => Projects => Service Base Phase 1

Service Base Phase 1

DW Mertzke Service Base Project Details

    Project: Rivers Project Phase 1, Service Base-Retaining Wall, Fence and Pavement Rehabilitation
    Client: US Army Corps of Engineers-St. Louis District
    Contract No. W912P9-17-C-0020
    NTP: 7/14/17, Completion Date: 9/30/2017, 100% Complete

    The US Army Corps of Engineers-St. Louis District awarded a contract to DW Mertzke General Contractors to rehabilitate a parking lot at the Service Base in downtown St. Louis. This project was fast tracked as the funding was to be expended by the end of the fiscal year. The project consisted of design/build of a parking lot, retaining wall, fencing, ADA ramp and pavement markings. The work consisted of excavation, hauling, retaining walls, fencing, cast in place concrete, asphalt paving, striping and surveying This project required staged construction as the base is an ongoing operation. This project was completed on time with DW Mertzke self-performing 54% of the contract.